              I. CUSTOMER ENVIRONMENT / PROJECT CONTEXT

               

              Customer profile:

              • Consulting Engineering for all fields relating to Natural Gas. In partnership with foreign companies, it was responsible for the new liquid natural gas terminal designed to provide 8 billion m3 of Natural Gas per year with a storage capacity of 330,000 m3 in 3 reservoirs.
               

              Customer objective and constraints:

              • Validate the electrical distribution network architecture to show that availability and reliability targets for the process have been met, taking into account:
                 - Load sensitivity
                 - Future network expansion
                 - Equipment maintainability
               

              II. SOLUTION IMPLEMENTATION

               

              Implementation methodology (main phases):

              • Electrical Distribution Network Reliability Study
                1. Understand and identify risks
                2. Optimise architecture, compare solutions, highlight weak points
                3. Design redundancies and back-up configurations
                4. Optimise maintenance plan
               

              Duration:

              • 2005: 6 months
               

              Solution overview (services, products, systems, architectures...):

              Solution overview (services, products, systems, architectures...):
               

              III. RESULTS / ACHIEVEMENT

               

              Customer benefits:

              • Loss of gas emission on distribution & transport network:
                 - Overall target unavailability < 2 hours per year; P(t) < 2.28.10-4; Availability better than 99,977%
                 - Overall target unreliability < 1 occurrence per year; λeq (t) < 1.14.10-4 /h
               

              Schneider Electric differentiating values VS competitors:

              Target availability and reliability are achieved thanks to:
              • Taking into account dependability issues from the early stage of the project
              • Redundancy implemented at architecture level
              • Automatic reconfiguration
              • Process equipment dispatching
              • Failure detection system
               
               
               
               
               

              Solution breakdown

              Main services:
              • Engineering services: Services
              Main products & systems:
              • MV
              • MV/ LV Tfos