Water
              Water logo

              Success Story: Water

              Bacviz Kecskemet (Hungary)

              Service solution to reduce energy consumption and the electricity bill in a pumping station

              Success Story: Water 15% energy savings, ROI in less than 3 years

               

              I. CUSTOMER ENVIRONMENT / PROJECT CONTEXT

               

              Customer profile:

              • Bacviz is the operation company in charge of providing drinking water to the town and region of Kecskemet. It represents a population of 120 000 inhabitants.
               

              Customer objective and constraints:

              • In Hungary the electrical utility providing electrical energy to the water operation company has a price policy based on a fixed subscription. When the water utility has peak demands over the subscription value some penalties are applied. The water utility wants to avoid this cost.
              • More generally a clear understanding of the consumption of the different process steps is required to optimise the process. On average electricity bill accounts for up to 30% of operation cost for a water utility.
               

              II. SOLUTION IMPLEMENTATION

               

              Implementation methodology (main phases):

              1. Meeting with operators to understand the key step of the process: deep underground pumping, sand filters, chlorination.
              2. Instrumentation of the customer's electrical network with measurement devices connected to a web server.
              3. Analysis of the data collected by the Schneider Electric services team.
              4. Creation of an official report on a regular basis and presentation of the conclusions to the operation company staff.
               

              Duration:

              • 2 years: 2004 to 2006
               

              Solution overview (services, products, systems, architectures...):

               
              Solution overview (services, products, systems, architectures...):1. Revamping of Low Voltage switchgear
              2. Compact NS Micrologic electronic trip units
              3. Powerlogic meters and control
              4. Modbus/Ethernet communication units
              5. Ethernet server information collection
              6. Information analysis
               

              How did we estimate the energy savings (methodology, tools, ...)

              • Energy savings were directly obtained by the reduction of the contract from a 600kW base to a 400kW base (winter subscription)
               

              III. RESULTS / ACHIEVEMENT

               

              Customer benefits:

              • The customer has a lower contract with the water utility.
              • He is able to manage the process to avoid peak demand : no filter backwashing during deep water pumping for instance.
              • Balancing of the pumps to limit ageing.
              • Pulsed air compressor optimisation.
               

              Customer testimonies (Verbatim):

              • Plant operation manager: "After 6 months of operation and the two first monitoring reports we have optimised the energy cost . We wish to extend the complete supervision of our electrical equipment on 2 pumping stations at Kecskemet."
               

              Schneider Electric differentiating values VS competitors:

              • Local service team collaboration with a local panel builder.
              • Full solution proposed by the same team including electrical equipment revamping, Ethernet TCP/IP transmission of data via a safe router, interpretation of data by experts, quarterly reports for recommendations.
               
               
               
               
               

              Solution breakdown

              Main services:
              • Engineering services: Services
              Main products & systems:
              • Compact NS
              • Powerlogic
              • Variable speed drive ATV